| name of
the building |
|
|
|
identification
of the compartment |
|
|
|
|
|
variant 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Acceptable risk calculation |
|
|
Variant 2 can
be used for an alternative proposition, e.g. improving the fire resistance |
|
|
|
|
|
|
|
|
|
|
| DATA |
Symbol |
Unit |
A - REF |
CHANGING DATA |
|
CHANGED |
CHANGE ? |
Variant 2 |
|
|
|
VALUES |
|
Comments[1] |
|
| Activation factor[2] |
|
|
DEFINE all relevant situations[3] |
|
|
|
|
| Main activities |
ai |
|
0 |
A1.
Non industrial occupancies: offices, residential, assembly, educational |
0 |
|
0 |
no |
0 |
|
|
| Process and
room[4] |
ai |
|
0 |
E2.
Heat transfer through water, steam, or solids |
0 |
|
0 |
no |
0 |
|
|
| heating systems |
ai |
|
0,1 |
F2.
Heat generator in the compartment itself. |
0 |
|
0 |
no |
0,1 |
|
|
| |
ai |
|
0,1 |
G2.
Energy source: gas |
0,1 |
|
0,1 |
no |
0,1 |
|
|
| Electrical
Installations.[5] |
ai |
|
0 |
I1.
In compliance with the rules and regularly checked |
0 |
|
0 |
no |
0 |
|
|
| Explosion
risks.[6] |
ai |
|
0 |
Z. Not applicable |
0 |
|
0 |
no |
0 |
|
|
| Dust hazard |
ai |
|
0 |
K0.
Not applicable |
0 |
|
0 |
no |
0 |
|
|
| Secondary
activities[7] |
ai |
|
0 |
Secondary
welding operations |
no |
|
0 |
no |
0 |
|
|
| |
ai |
|
0 |
Additional
woodworking or use of plastics |
no |
|
0 |
no |
0 |
|
|
| Painting,
spraying, glues, etc. |
ai |
|
0 |
NONE |
0 |
|
0 |
no |
0 |
|
|
| Others |
ai |
|
0 |
Special
hazards (e.g. non-controllable smokers) |
no |
|
0 |
no |
0 |
|
|
| |
|
INFO A |
0,2 |
Total value of activation factor a: |
a |
= |
0,1 |
|
0,2 |
|
| Evacuation time factor |
|
|
|
|
|
| |
b |
m |
40 |
value entered
at: potential risk factor g |
|
|
40 |
no |
40 |
|
| |
l |
m |
50 |
value
entered at: potential risk factor g |
|
|
50 |
no |
50 |
|
| Number of
occupants |
X[8] |
persons/m² |
100 |
User defined total number of persons in the
compartment |
m |
100[9] |
100 |
no |
100 |
|
|
|
|
|
|
| Total of exit
units |
x |
exit units[10] |
2 |
x
is the number of exit units. The minimal width for an exit is 0.6 m (or 2 ft)
unless law or practical conditions specify it otherwise.[11] |
2 |
50[12] |
2 |
no |
2 |
|
|
|
|
|
|
| Exits to
outside the building |
O |
number |
2 |
Number
of exits (doors and stairs) that end in the open air |
2 |
paths: |
2 |
no |
2 |
|
|
|
|
| DISTINCT exit
paths |
K |
number |
2 |
Calculated
number of distinct exit paths:. |
2,4 |
gives: |
2 |
no |
2 |
|
|
|
|
| Mobility
factor |
p[13] |
INFO A |
1 |
B.
Mobile persons needing guidance ( pupils, visitors) |
2 |
|
2 |
no |
1 |
|
|
| |
|
|
0 |
People with limited
perception of the risk[14] |
no |
|
0 |
no |
0 |
|
|
|
|
| |
|
|
0 |
There is a clear
evacuation plan: |
yes |
|
0 |
no |
0 |
|
|
|
|
|
| |
|
|
0 |
There is a danger for
panic |
no |
|
0 |
no |
0 |
|
|
|
|
| |
|
|
1 |
|
|
p = |
2 |
|
1 |
|
|
|
|
| Equivalent
length of vertical travelling path |
|
|
0 |
based
on H+ or H- value entered at potential risk factor z |
1,25 |
0 |
0[15] |
no |
0 |
|
|
|
|
|
| |
|
seconds |
54,57 |
Calculated
egress time (FRAME) |
54,57[16] |
|
|
|
|
|
|
|
|
|
| RSET |
|
seconds |
0,00 |
As defined with EGRESS
SIMULATION software [17] |
0,00 |
|
|
|
|
|
|
|
|
|
| |
|
|
0,08 |
Evacuation time
factor |
t |
= |
0,08 |
no |
0,08 |
|
|
|
|
| Content
factor [18] |
|
|
|
|
|
| Relative
value |
c1 |
|
0,1 |
a. the contents can be easily
replaced |
0 |
|
0 |
no |
0,1 |
|
|
| Absolute
value of content[19] |
|
EUR[20] |
13 |
Actual value in
million of CURRENCY (e.g. EUR, GBP, USD, SWF... ) |
13,0 |
million |
EUR |
no |
|
|
|
| Building cost index |
|
|
654 |
National building
cost index at the time of the risk assessment |
654 |
|
|
|
|
|
|
| Correction
for inflation |
|
|
503 |
National building
cost index in 2000 |
503 |
in 2000: |
10,00 |
|
|
|
|
| Exchange
rate |
|
|
1 |
1 CURRENCY =
x.yz EURO |
1,00 |
in EURO |
|
EUR |
|
|
|
| Reference
value |
|
|
9,99847 |
Value
in EURO , at given exchange rate and corrected for inflation |
0,77 |
|
10,00 |
|
10,00 |
|
|
| Content
value factor |
c2 |
|
0,04 |
|
|
|
0,04 |
|
0,04 |
|
|
| |
|
|
0,14 |
0 |
c |
= |
0,04 |
|
0,14 |
|
|
|
|
| Environment
factor |
|
|
|
|
|
| |
Qi |
|
100 |
value entered
at potential risk factor q |
|
|
100 |
no |
100 |
|
|
| |
M |
|
2,5 |
value
entered at potential risk factor i |
|
|
2,5 |
no |
2,50 |
|
|
| |
|
|
0,45 |
Environment
factor |
r |
= |
0,45 |
|
0,45 |
|
|
| Dependency
factor |
|
|
|
|
|
| Added
value /turnover ratio[21] |
d |
INFO A |
0,3 |
g. USER DEFINED INPUT (at info A) |
0,63 |
0[22] |
0,63 |
no |
|
|
|
| |
|
|
0,3 |
Dependency
factor |
d |
= |
0,63 |
|
0,30 |
|
| Acceptable Risks |
|
|
|
|
| |
|
|
|
Acceptable risk values for : |
|
variant 2 |
|
|
|
|
|
| Activation
factor |
a |
0,20 |
|
property (building and
content) = 1.6 - a - t - c |
A |
1,19 |
|
|
|
Date of this analysis |
|
| Evacuation time factor |
t |
0,08 |
|
occupants (people) =
1.6 - a - t - r |
A1 |
0,87 |
|
|
|
|
|
| 0 |
c |
0,14 |
|
activities = 1.6 - a -
c - d |
A2 |
0,96 |
|
|
|
date(s) of the analysis |
|
| Environment factor |
r |
0,45 |
|
WARNING :If the value of
A or A1 or A2 is lower than 0.2 or even negative, |
|
|
|
|
|
| Dependency factor |
d |
0,30 |
|
an unacceptable risk situation exists ! CHANGE first a, t, c,
r or d |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|